Full Home Interiors · Art Deco Glam
Emerald Deco Complete villa, deco Full Home Interiors Design
Fluting, fans and geometry. Lacquered colour, brass inlay lines and mirror used as architecture. A whole-home project is a coordination problem. One drawing set, one material palette, one installation sequence — which is the only way the finishes actually line through from room to room.

Specification
Full Home Interiors design details
| Detail | Specification |
|---|---|
| Layout | Complete villa, deco |
| Style | Art Deco Glam |
| Palette | Emerald · Brass · Lacquer |
| Scope | Turnkey with bespoke furniture |
| Palette | Emerald, brass, lacquer |
| Timeline | 90 days from sign-off |
| Continuity detail | One brass inlay line throughout |
| Home size | Room dimension |
|---|---|
| 1 BHK | 1 BHK, 350-500 sq ft |
| 2 BHK | 2 BHK, 600-900 sq ft |
| 3 BHK | 3 BHK, 1,100-1,500 sq ft |
| 4 BHK | 4 BHK, 1,700-2,200 sq ft |
| 4+ BHK / Villa | Villa, 2,500 sq ft plus |
Storage features
- A bar, a dressing room and a media wall
- Concealed service corridors
- Bespoke storage per room
Special features
- A brass inlay line running through every room
- Fluting at three different scales
- Lacquer colour shifting room to room
Ideal forVillas and premium apartments wanting a fully bespoke result
Compare
The same full home interiors in the other five styles
One brief, six resolutions. Each carries its own layout, material specification and storage strategy.

Minimal Complete 2BHK, minimal Full Home Interiors
Chalk · Pale Oak · Linen
See this design
Bold Complete 3BHK, contemporary Full Home Interiors
Charcoal · Oxblood · Smoked Oak
See this design
Heritage Complete 3BHK, heritage Full Home Interiors
Teak · Cane · Antique Brass
See this design
Classic Complete 4BHK, classic Full Home Interiors
Ivory · Statuario · Gold
See this design
Scandi Complete 2BHK, Scandinavian Full Home Interiors
Birch · Chalk · Sage
See this designQuestions
Full Home Interiors questions
What does a turnkey interior project actually include?
Design and drawings, all modular and bespoke joinery, false ceilings, electrical and lighting layouts, painting, flooring where in scope, bathroom and kitchen fit-out, and installation and handover. Furniture and soft furnishing are usually a separate line.
How long does a full home take?
45 days for a 2BHK of standard scope from design sign-off, 55–75 days for a 3–4BHK, and longer where there is civil work, stone or bespoke furniture. Delays almost always come from changes after sign-off, not from the factory.
Is it cheaper to do the whole home at once?
Usually yes, by 10–15%. One site mobilisation, one installation team and one material order beats three separate phases — and it is the only way the detailing genuinely matches across rooms.
Can we live in the house during the work?
For a single-room scope, yes. For a full home, it is far better not to — dust from ceiling and civil work travels through the whole flat and the programme stretches considerably.
What is fixed and what can change after sign-off?
Finishes and hardware can often change within the same price band up to production release. Layout, carcass sizes and electrical positions are locked at sign-off because the factory cuts to that drawing.
Next step
Build this full home interiors.
Send the floor plan and the room dimensions. We come back with this design adapted to your space and priced line by line.