LUXURY DESIGNERInteriors, authored.

How it works

Six stages, one accountable programme.

No handoff between a designer who draws and a contractor who guesses. The studio that specifies the detail is the studio that installs it.

Process interior in the Bold Contemporary style
CustomisableEvery module redrawn to your room, not picked off a shelf
Lifetime warranty*On modular cabinetry, hardware and factory finishes
Easy EMIsSplit the project across the build, interest options available
45-day deliveryFrom design sign-off to handover on standard scopes
4.5 ratingAverage handover score across completed residences

The programme

From first measurement to handover

01

Understand

We measure the flat, walk it with you, and write down what the project actually has to achieve — how many people, how you cook, what you own and where it currently lives.

Site measurement · Requirement brief · Budget band

02

Space planning

Layouts, circulation, storage volumes and service positions. We test two or three arrangements against the brief before choosing one.

Layout options · Circulation check · Storage schedule

03

Design intent

Materials, finishes, lighting and joinery detail, presented as plans, elevations and a material schedule you can interrogate.

Elevations · Material schedule · Lighting layout

04

Estimate

A line-by-line estimate against the schedule. You can see what each decision costs and change it here, where changing it is free.

Line-by-line pricing · Options priced · Sign-off

05

Manufacture

Carcasses cut to the approved drawing, edge-banded on four sides, hardware fitted and quality-checked before dispatch.

CNC production · QC check · Dispatch

06

Install & hand over

Site installation on a fixed programme, snagging closed before handover, and a documented drawing set for your records.

Installation · Snag closure · Handover pack

Typical programme

How long each stage actually takes

Ranges from completed projects, not best-case estimates. Civil work, stone and bespoke furniture push toward the longer end of each band.

ScopeDesignProduction + siteTypical total
Single room (kitchen or wardrobes)1–2 weeks3–4 weeks4–6 weeks
2 BHK, full home2–3 weeks5–6 weeks7–9 weeks
3–4 BHK, full home3–4 weeks7–10 weeks10–14 weeks
Villa or full turnkey with civil work4–6 weeks12–20 weeks16–26 weeks

In detail

What each stage actually hands you

What you actually receive at each stage

Not a single render and an invoice. Space planning hands you two or three layout options drawn to scale, with circulation and storage volume marked. Design intent hands you elevations for every wall, a material schedule naming every grade and finish, and a lighting layout. The estimate is priced against that exact schedule, line by line, so a change to one decision has a visible, isolated cost rather than moving the whole number.

Why sign-off is the date that matters most

Before sign-off, changing a layout, a carcass size or an electrical position costs nothing — it is a line on a drawing. After sign-off, the factory has cut to that drawing and the electrician has run conduit to those points, so the same change means unpicking finished work. We tell you plainly, at every stage, whether a decision is still free to change or already locked.

What 'accountable programme' means in practice

One project manager tracks the programme against the dates agreed at sign-off, and tells you early — with a reason — if something is going to slip. Most slippage traces back to a change requested after sign-off rather than to the studio's own production, which is exactly why the sign-off drawing is treated as fixed.

Questions

About the process

How long does a project take?

45 days from design sign-off for a standard 2 BHK scope, 55–75 days for a 3–4 BHK, longer where there is civil work, stone or bespoke furniture. Delays almost always come from changes made after sign-off.

What is fixed at sign-off?

Layout, carcass sizes and electrical positions, because the factory cuts to that drawing. Finishes and hardware can often still change within the same price band until production release.

Can we live in the house during the work?

For a single-room scope, yes. For a full home it is far better not to — ceiling and civil dust travels through the whole flat and the programme stretches considerably.

Who supervises the site?

A named site supervisor with a defined visit schedule, plus your designer at the key installation milestones. Projects go wrong in the gap between the drawing and the installer's interpretation.

What happens at handover?

Snagging is closed before handover, not listed at it. You receive a documented drawing set, the material schedule and the warranty terms in writing.

What if I want to see the factory or the site mid-project?

You are welcome at both. Factory visits are arranged around the production schedule; site visits happen naturally at the milestones your project manager walks you through, and outside those you are free to visit during working hours with notice.

Does the six-stage programme change for a single-room scope?

The stages are the same; the time inside each one is shorter. A kitchen or a set of wardrobes moves through understanding, planning, design intent, estimate, manufacture and handover in roughly a third of the time a full home takes.

How much of the programme depends on decisions I need to make?

More than most people expect. The design and estimate stages move at the pace you approve options at; the manufacture and installation stages run on our own schedule once sign-off happens, which is exactly why unhurried decision-making before sign-off pays off afterwards.

Is the programme different for a full turnkey project with civil work?

Yes — civil work, waterproofing and structural changes are sequenced before the modular stages begin, since joinery cannot go in until the walls, floors and services behind it are finished.

What is the earliest stage I can walk away without cost?

Any point before design sign-off — the survey, layout options and estimate are free and carry no obligation. After sign-off, production has started against your specific drawing.

Do you provide a written contract before production starts?

Yes — the material schedule, the programme dates and the payment milestones are all set out in writing before any factory production is released, not agreed informally and formalised later.

What causes most delays that are within the studio's control?

Material substitution when a specified item is out of stock, and coordination gaps on multi-trade sites where civil work has to finish before modular installation starts. Both are managed by the project manager and flagged the moment they are known, not discovered at the missed date.

Why this structure

What six stages actually buy you

Why six stages rather than fewer

Each stage ends with something you can check — a layout, a drawing, a price, a physical component — rather than a verbal assurance that things are on track. Compressing stages to move faster usually means skipping the checkpoint, not skipping the work, and the work still has to happen eventually, at a worse time to catch a mistake.

What a well-run programme actually protects

Not just the date — the ability to change your mind cheaply. A programme with clear stage boundaries tells you exactly how much a change costs at any given moment, which is what lets you make good decisions under time pressure instead of guessing.

Why manufacture and installation sit inside the same programme as design

Because a drawing that the factory cannot build to a tolerance, or a detail the installer cannot execute cleanly, is not actually finished — it just looks finished on paper. Running all six stages under one studio means those constraints are caught at the design stage, not discovered on site.

What a client's actual workload looks like across the six stages

Heaviest at understand, plan and design intent, where decisions get made; light during manufacture, where the factory is executing an approved drawing; brief again at install and handover, for walkthroughs and sign-off. Most of the calendar time is stage five, which needs the least of your attention.

What we would change about this process if we could

Very little at this point — most of the structure exists because an earlier version of a project taught us why a step was missing. The programme is closer to a settled discipline than an experiment, which is exactly why it is documented this explicitly.

Does a repeat client go through all six stages again?

Yes, at the same rigour — familiarity with a client does not shorten the survey or the drawing stage, because each project is measured and specified against its own room, not the last one.

Next step

Ready to start?

Send the floor plan and we will take it from there.

Powered by Joinchat