How it works
Six stages, one accountable programme.
No handoff between a designer who draws and a contractor who guesses. The studio that specifies the detail is the studio that installs it.

The programme
From first measurement to handover
Understand
We measure the flat, walk it with you, and write down what the project actually has to achieve — how many people, how you cook, what you own and where it currently lives.
Site measurement · Requirement brief · Budget band
Space planning
Layouts, circulation, storage volumes and service positions. We test two or three arrangements against the brief before choosing one.
Layout options · Circulation check · Storage schedule
Design intent
Materials, finishes, lighting and joinery detail, presented as plans, elevations and a material schedule you can interrogate.
Elevations · Material schedule · Lighting layout
Estimate
A line-by-line estimate against the schedule. You can see what each decision costs and change it here, where changing it is free.
Line-by-line pricing · Options priced · Sign-off
Manufacture
Carcasses cut to the approved drawing, edge-banded on four sides, hardware fitted and quality-checked before dispatch.
CNC production · QC check · Dispatch
Install & hand over
Site installation on a fixed programme, snagging closed before handover, and a documented drawing set for your records.
Installation · Snag closure · Handover pack
Questions
About the process
How long does a project take?
45 days from design sign-off for a standard 2 BHK scope, 55–75 days for a 3–4 BHK, longer where there is civil work, stone or bespoke furniture. Delays almost always come from changes made after sign-off.
What is fixed at sign-off?
Layout, carcass sizes and electrical positions, because the factory cuts to that drawing. Finishes and hardware can often still change within the same price band until production release.
Can we live in the house during the work?
For a single-room scope, yes. For a full home it is far better not to — ceiling and civil dust travels through the whole flat and the programme stretches considerably.
Who supervises the site?
A named site supervisor with a defined visit schedule, plus your designer at the key installation milestones. Projects go wrong in the gap between the drawing and the installer's interpretation.
What happens at handover?
Snagging is closed before handover, not listed at it. You receive a documented drawing set, the material schedule and the warranty terms in writing.
Next step
Ready to start?
Send the floor plan and we will take it from there.