Six stages, one accountable programme.

No handoff between a designer who draws and a contractor who guesses. The studio that specifies the detail is the studio that installs it.

Process interior in the Bold Contemporary style
CustomisableEvery module redrawn to your room, not picked off a shelf
Lifetime warranty*On modular cabinetry, hardware and factory finishes
Easy EMIsSplit the project across the build, interest options available
45-day deliveryFrom design sign-off to handover on standard scopes
4.5 ratingAverage handover score across completed residences

The programme

From first measurement to handover

01

Understand

We measure the flat, walk it with you, and write down what the project actually has to achieve — how many people, how you cook, what you own and where it currently lives.

Site measurement · Requirement brief · Budget band

02

Space planning

Layouts, circulation, storage volumes and service positions. We test two or three arrangements against the brief before choosing one.

Layout options · Circulation check · Storage schedule

03

Design intent

Materials, finishes, lighting and joinery detail, presented as plans, elevations and a material schedule you can interrogate.

Elevations · Material schedule · Lighting layout

04

Estimate

A line-by-line estimate against the schedule. You can see what each decision costs and change it here, where changing it is free.

Line-by-line pricing · Options priced · Sign-off

05

Manufacture

Carcasses cut to the approved drawing, edge-banded on four sides, hardware fitted and quality-checked before dispatch.

CNC production · QC check · Dispatch

06

Install & hand over

Site installation on a fixed programme, snagging closed before handover, and a documented drawing set for your records.

Installation · Snag closure · Handover pack

Questions

About the process

How long does a project take?

45 days from design sign-off for a standard 2 BHK scope, 55–75 days for a 3–4 BHK, longer where there is civil work, stone or bespoke furniture. Delays almost always come from changes made after sign-off.

What is fixed at sign-off?

Layout, carcass sizes and electrical positions, because the factory cuts to that drawing. Finishes and hardware can often still change within the same price band until production release.

Can we live in the house during the work?

For a single-room scope, yes. For a full home it is far better not to — ceiling and civil dust travels through the whole flat and the programme stretches considerably.

Who supervises the site?

A named site supervisor with a defined visit schedule, plus your designer at the key installation milestones. Projects go wrong in the gap between the drawing and the installer's interpretation.

What happens at handover?

Snagging is closed before handover, not listed at it. You receive a documented drawing set, the material schedule and the warranty terms in writing.